Freud St. Metering Facility Expansion

Detroit, MI

Project Details:

B&B preformed interior floor slabs and dock leveler pits. This project consisted of 550,000 sqft of interior floor slabs and 124 formed dock leveler pits . This project was preformed during winter conditions. This project was completed on time. This project lasted 4 months start to finish. 

  • 550,000 sqft - Interior Floor Slabs
  • 124 - Dock Leveler Pits
  • Project Duration - 4 months - On Time